Design for coolant drainage tunnel in the Gangleung Anin electronic power plant 1 and 2

Gangleung Anin power plant machine 1 and 2are of a part of business constructing 2 machines with capacity of 1,040MW of installation in the area of around Anin-ri, Gangdong-myeon, Gangleung-si. It is possible to acquire the coolantdrainage pipes by planning the circular shape of tunnel below the power plant facilities in Anin-station and Yeongdong between the site scheduled for the construction and coastal area.  
Client KEPCO
Business period 2016. 08 ~ 2020. 09
Business scale Power plant capacity : 2 machines  1,040MW
Site area: 1,096,000㎡
Deal with coal and saving facility 
Coolant drainage system, etc.